El Cajon Blvd Streetscape
In early 2023, the City of El Cajon began construction of the El Cajon Blvd Streetscape Project.
El Cajon Blvd Streetscape improvements include removing the traffic signal at El Cajon Blvd and Johnson Avenue and installing a single-lane traffic roundabout. Improvements include new asphalt street sections, decorative concrete features with new sidewalks, driveways and seat walls, decorative lighting, crosswalks, trees, landscaping and site furniture. Site furniture to include new benches, tables and trash receptacles.
See the project timeline below for El Cajon Blvd Streetscape.
See the funding sources below for El Cajon Blvd Streetscape.
DATE:
May 3, 2024
Work performed this week:
Continued installation of irrigation, soil amendments and planting throughout entire project. Installation of electrical conduit for new phase. Continued grading for curb/gutter and driveways on El Cajon Blvd between Johnson and Palm. Poured pedestrian ramps, curb/gutter and driveways on El Cajon Blvd between Johnson and Palm. Installed street and pedestrian lights throughout project.
Working schedule for next week:
Contractor is scheduled to continue installation of irrigation, soil amendments and planting throughout entire project. Continue installing site furniture throughout project. Continue forming and pouring curb/gutter, sidewalk and driveways on El Cajon Blvd between Johnson Avenue and Palm Ave.
General Contractor:
Tri-Group Construction & Development
Dominic Oshana
9580 Black Mountain Rd, Suite L
San Diego CA 92126
858.689.0058
Construction Manager:
Project Professionals Corporation
Josh Johnson, PE
4700 Spring Street, Suite 100
La Mesa, CA 91942
858.634.8180
Project Manager:
City of El Cajon
Senan Kachi
200 Civic Center Way
El Cajon, CA 92020
619.441.1653